Our commission teams have the speed and flexibility to excel when dealing with time critical projects and understand that “yesterday” is often when things are needed.

It is our policy to involve the commissioning engineer at an early stage of the project to gain a vital appreciation of the commissioning requirements, weather it is a simple investigation time delays, day/night mode, coincidence/double knock mode or a phased evacuation by involving them at an early stage it minimises the time required at the end of the project when often time and access are of a premium.

Our competent and experienced engineers are fully product trained and FIA/BAFE trained and can advise on the practicalities of product installation, specification and British and European Standards.

On completion of the Commissioning process a BS 5839 or NSI certificate is issued.

Once the system is commissioned in full, with witness testing complete, end user training is given both in the operation of the control equipment and the user responsibility for the management and ongoing maintenance of the system.

Operational and Maintenance manuals are issued that contain certification, record drawings, testing schedules, manufacturer’s manuals and maintenance requirements.

On completion of the Acceptance process a BS 5839 or NSI certificate is issued.